# Hold min SOC -> Forced EOC
Initial State: Hold min SOC
Target State: Forced EOC
Test Procedure
Min SOCis set lower than the current SOCMin SOCshould be 50% or lowerGrid setpointis set to a negative value (-2000W)- Wait until the system reaches the
Hold min SOCstate - activate
Force charge nowon the remote console
Expected Outcome
As soon as Force charge now is activated, the system changes into the Forced EOC state and charges with high power (min. 1000W)
Tested Outcome
The system reacted as expected and switched from Hold min SOC state to Forced EOC state when Force charge now was activated on the
remote console. The charging power was around 1200W. The were observed power drops during this process.